Change Order State
→ → → →
To change the state of an order:
Navigate to Suite Catering Orders List.
From the Orders List, locate the order(s), then to the left of the order(s), select the order checkbox(es).
From the upper-left of the Order List, use the Actions dropdown to select Change Order State.
From the Change Order State panel, use the Operations to Order(s) dropdown to select the order state.
For details about order states, see Order States.